Road · Trail · Ultra

Ultra Running Pace Calculator

Plan your next race from 5K to 200 miles. Calculate your running pace, estimate finish times, and build a more realistic ultra race plan.

1. Your running pace

Enter your average pace to estimate your race finish time.

Your estimated finish

A planning estimate based on your pace and selected adjustments.

Estimated finish · 5K 00:32:30

Including terrain and planned stops.

Moving time00:31:00
Stopped time01:00:00
Adjusted pace6:36 /km
Overall pace18:36 /km
Coach's note

For ultras, plan around terrain, fueling, fatigue, and aid-station time — not pace alone.

Finish-time chart: 5K to 200 miles

Compare estimated moving times and finish times including your planned stops.

Race distanceDistanceMoving timeWith stops

These estimates assume a constant average pace with a simple terrain allowance. They do not predict elevation effects, fatigue, weather, or technical trail conditions. Real race times can vary significantly.

Goal finish-time planner

Work backward from your target time to estimate the moving pace you need.

Required average moving pace—

Enter a goal time to calculate your required pace.

Ultra running pace calculator FAQs

How do I calculate my ultra finish time?

Multiply your average pace by the distance to estimate moving time, then add planned aid-station stops and breaks. For trail races, consider elevation, technical terrain, weather, and fatigue.

What is a good pace for a 100-mile race?

There is no single ideal pace. It depends on the course, elevation gain, cut-offs, conditions, experience, and goals. Plan from a realistic finish time and allow for stops and unexpected delays.

How do I account for aid stations?

Enter your expected total stopped time, including aid stations, drop bags, clothing changes, and breaks. Detailed race plans can estimate each stop separately.

Can I calculate a 200-mile race?

Yes. This calculator includes 200 miles, approximately 321.9 kilometres. Treat the result as a rough estimate and create a separate fueling, sleep, crew, and contingency plan.

Is the terrain adjustment accurate?

It is a simple percentage adjustment, not a validated elevation model. For a better estimate, use course-specific data, elevation profiles, race cut-offs, and your results on similar terrain.